Shooting Schedule
Wednesday, 1 May 2013
T2 - Continuity Task
Roles
-Director - Harry
-Camera Operator - Sam
-Sound Operator - Sam
-Editor - James
-Still camera - Alex
-Director - Harry
-Camera Operator - Sam
-Sound Operator - Sam
-Editor - James
-Still camera - Alex
T3 - Continuity
Continuity Task
Trim down the original footage, to be left with a rough cut version of the footage, then trim smaller parts of this footage to form a more accurate version of the footage, that makes sense and follows the rules of continuity.

Tape Logging
Renamed the footage we collected to represent what was within these clips, to make it easier to find the correct shot that is required.

Audio Mixing
Using the audio levels on the side,
I was able to adjust the audio accordingly.
Trim down the original footage, to be left with a rough cut version of the footage, then trim smaller parts of this footage to form a more accurate version of the footage, that makes sense and follows the rules of continuity.

Tape Logging
Renamed the footage we collected to represent what was within these clips, to make it easier to find the correct shot that is required.

Audio Mixing
Using the audio levels on the side,
I was able to adjust the audio accordingly.
Subscribe to:
Posts (Atom)